SUNY Cortland the online guide Old Main

 


MISSION STATEMENT

 

The Physical Plant's mission is to efficiently maintain and operate the physical facilities of SUNY Cortland in order to provide a clean, attractive, safe, healthy and productive environment for living, teaching, learning, playing and working.

  • Our GOAL is to provide these services to our CUSTOMERS in a manner consistent with SUNY Cortland's culture of improvement.

We make a difference!

Facts about Facilities

The main campus encompasses 2-1/2 million square feet, with a replacement value of $340 million dollars, consisting of 41 structures linked by underground electrical, sanitary, storm, gas, steam, and domestic water lines on 191 acres, including 45 acres of athletic fields all maintained by Physical Plant staff.

In addition, Physical Plant is responsible for 276,000 square feet of roads, 576,000 square feet of walks, steps, and terraces, 35 acres of manicured lawn, over 175 air conditioning/refrigeration units, 32 elevators, two olympic size swimming pools, a 2,400 seat ice arena, and over 4,000 pieces of mechanical equipment, all of which are tracked by a preventative maintenance management system. Our Central Heating Plant, which houses six high pressure steam boilers capable of producing 160 million BTUs per hour, operates 24 hours per day providing around the clock coverage and emergency service to the entire campus. Physical Plant also provides support services and supplies to satellite operations at Hoxie Gorge, Brauer Geological Field Station in Selkirk, and the 446 acre Outdoor Recreation Center located at Raquette Lake.

 

[Return to Physical Plant main page]