| Full Project Log - 1/08 | |||||||
| Project # | Coordinator | Start | Finish | Project Name | Phase | Client | % Complete |
| 2008034 | Bruce | 1/16/2008 8:00 | 8/15/2008 17:00 | Alger Hall Emergency Lighting for Generator | Planning | 17% | |
| 1/16/2008 8:00 | 1/16/2008 17:00 | 1.Design | 50% | ||||
| 1/16/2008 8:00 | 1/16/2008 17:00 | 2.Bid | 0% | ||||
| 8/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||
| 2008036 | Phil | 1/16/2008 8:00 | 8/15/2008 17:00 | Alger Hall RHD Office New Windows | Planning | 0% | |
| 1/16/2008 8:00 | 1/16/2008 17:00 | 1.Design | 0% | ||||
| 1/16/2008 8:00 | 1/16/2008 17:00 | 2.Bid | 0% | ||||
| 8/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||
| 200774 | Joe We | 2/1/2007 8:00 | 5/15/2008 17:00 | Alumni House New Accessible Entry Ramp & 1st Flr Powder Room | Design | Doug DeRancy | 22% |
| 2/1/2007 8:00 | 8/7/2007 17:00 | 1.Design | 100% | ||||
| 2/1/2007 8:00 | 8/7/2007 17:00 | 2.Bid | 0% | ||||
| 2/1/2007 8:00 | 5/15/2008 17:00 | 3.Construction | 0% | ||||
| 2008037 | Phil | 1/16/2008 8:00 | 8/15/2008 17:00 | Bishop Hall Automatic Doors RHD Apartment & Office | Planning | 0% | |
| 1/16/2008 8:00 | 1/16/2008 17:00 | 1.Design | 0% | ||||
| 1/16/2008 8:00 | 1/16/2008 17:00 | 2.Bid | 0% | ||||
| 8/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||
| 200797 | Bruce | 8/15/2007 8:00 | 10/25/2007 17:00 | Bowers Hall Loading Dock Signage | Complete | J. Sternfeld | 99% |
| 8/15/2007 8:00 | 8/15/2007 17:00 | 1.Design | 100% | ||||
| 8/15/2007 8:00 | 8/15/2007 17:00 | 2.Bid | 100% | ||||
| 8/15/2007 8:00 | 10/25/2007 17:00 | 3.Construction | 100% | ||||
| 200625 | Joe Wo | 2/1/2007 8:00 | 11/1/2007 17:00 | Bowers Hall Parking Lot Redesign | Complete | 100% | |
| 2/1/2007 8:00 | 2/1/2007 17:00 | 1.Design | 100% | ||||
| 4/15/2007 8:00 | 4/16/2007 17:00 | 2.Bid | 100% | ||||
| 7/2/2007 8:00 | 11/1/2007 17:00 | 3.Construction | 100% | ||||
| 2008027 | Phil | 12/20/2007 8:00 | 12/20/2007 17:00 | Bowers Hall Rm 48 Asbestos Abatement | Complete | Twiss | 100% |
| 12/20/2007 8:00 | 12/20/2007 17:00 | 1.Design | 100% | ||||
| 12/20/2007 8:00 | 12/20/2007 17:00 | 2.Bid | 100% | ||||
| 12/20/2007 8:00 | 12/20/2007 17:00 | 3.Construction | 100% | ||||
| 2008051 | Bruce | 1/16/2008 8:00 | 8/15/2008 17:00 | Bowers Hall Rm 339 New Stools | Planning | 0% | |
| 1/16/2008 8:00 | 1/16/2008 17:00 | 1.Design | 0% | ||||
| 1/16/2008 8:00 | 1/16/2008 17:00 | 2.Bid | 0% | ||||
| 8/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||
| 2007118 | Joe Wo | 5/10/2007 8:00 | 9/1/2010 17:00 | Bowers Hall Science Building Upgrade | Planning | 0% | |
| 5/10/2007 8:00 | 8/15/2007 17:00 | 1.Design | 0% | ||||
| 8/3/2009 8:00 | 10/9/2009 17:00 | 2.Bid | 0% | ||||
| 10/9/2009 8:00 | 9/1/2010 17:00 | 3.Construction | 0% | ||||
| 2007109 | Joe We | 4/25/2007 8:00 | 9/1/2008 17:00 | Campuswide Evacuation Routes | Planning | 31% | |
| 4/25/2007 8:00 | 4/25/2007 17:00 | 1.Design | 0% | ||||
| 8/15/2007 8:00 | 8/15/2007 17:00 | 2.Bid | 0% | ||||
| 8/15/2007 8:00 | 9/1/2008 17:00 | 3.Construction | 31% | ||||
| 2007120 | Joe Wo | 5/21/2007 8:00 | 8/1/2008 17:00 | Campuswide Landscaping Upgrades | Constr | 95% | |
| 5/21/2007 8:00 | 5/21/2007 17:00 | 1.Design | 100% | ||||
| 5/21/2007 8:00 | 5/21/2007 17:00 | 2.Bid | 100% | ||||
| 8/31/2007 8:00 | 8/1/2008 17:00 | 3.Construction | 95% | ||||
| 2007105 | Joe We | 6/1/2007 8:00 | 12/31/2008 17:00 | Campuswide Update Underground Utility Maps | Planning | 0% | |
| 6/1/2007 8:00 | 8/15/2007 17:00 | 1.Design | 0% | ||||
| 6/1/2007 8:00 | 8/15/2007 17:00 | 2.Bid | 0% | ||||
| 6/1/2007 8:00 | 12/31/2008 17:00 | 3.Construction | 0% | ||||
| 200677 | Joe Wo | 6/1/2007 8:00 | 5/30/2008 17:00 | Campuswide Utility Infrastructure Study | Design | 10% | |
| 6/1/2007 8:00 | 5/30/2008 17:00 | 1.Design | 20% | ||||
| 6/1/2007 8:00 | 5/30/2008 17:00 | 2.Bid | 0% | ||||
| 5/30/2008 8:00 | 5/30/2008 17:00 | 3.Construction | 0% | ||||
| 200745 | Chris | 12/1/2006 8:00 | 8/10/2007 17:00 | Casey Tower Bathroom Renovations Phase II | Complete | 99% | |
| 12/1/2006 8:00 | 12/1/2006 17:00 | 1.Design | 100% | ||||
| 12/1/2006 8:00 | 12/1/2006 17:00 | 2.Bid | 100% | ||||
| 12/1/2006 8:00 | 8/10/2007 17:00 | 3.Construction | 100% | ||||
| 2008032 | Chris | 1/16/2008 8:00 | 5/15/2008 17:00 | Casey/Smith Tower Heating Conversion Study | Planning | 0% | |
| 1/16/2008 8:00 | 1/16/2008 17:00 | 1.Design | 0% | ||||
| 1/16/2008 8:00 | 1/16/2008 17:00 | 2.Bid | 0% | ||||
| 5/15/2008 8:00 | 5/15/2008 17:00 | 3.Construction | 0% | ||||
| 200668 | Joe Wo | 5/18/2006 8:00 | 1/1/2008 17:00 | Central Quad Conceptual Plan | Planning | 49% | |
| 5/18/2006 8:00 | 12/1/2006 17:00 | 1.Design | 50% | ||||
| 12/1/2006 8:00 | 12/1/2006 17:00 | 2.Bid | 0% | ||||
| 1/1/2008 8:00 | 1/1/2008 17:00 | 3.Construction | 0% | ||||
| 200754 | Chris | 12/4/2006 8:00 | 5/15/2008 17:00 | Clark Hall Install Automatic Door Closures | Planning | Sarah G. | 0% |
| 12/4/2006 8:00 | 12/4/2006 17:00 | 1.Design | 0% | ||||
| 1/16/2008 8:00 | 1/16/2008 17:00 | 2.Bid | 0% | ||||
| 5/15/2008 8:00 | 5/15/2008 17:00 | 3.Construction | 0% | ||||
| 2008056 | Joe Wo | 1/16/2008 8:00 | 5/15/2008 17:00 | Construction Trailer Roof Repair | Planning | 0% | |
| 1/16/2008 8:00 | 1/16/2008 17:00 | 1.Design | 0% | ||||
| 1/16/2008 8:00 | 1/16/2008 17:00 | 2.Bid | 0% | ||||
| 5/15/2008 8:00 | 5/15/2008 17:00 | 3.Construction | 0% | ||||
| 2008058 | Phil | 1/15/2008 8:00 | 8/15/2008 17:00 | Corey Union 3rd Floor Womens Bathroom | Planning | 0% | |
| 1/15/2008 8:00 | 1/15/2008 17:00 | 1.Design | 0% | ||||
| 1/15/2008 8:00 | 1/15/2008 17:00 | 2.Bid | 0% | ||||
| 8/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||
| 200656 | Chris | 4/3/2006 8:00 | 11/1/2007 17:00 | Corey Union Gas Service Installation | Complete | 99% | |
| 4/3/2006 8:00 | 4/3/2006 17:00 | 1.Design | 100% | ||||
| 4/3/2006 8:00 | 4/3/2006 17:00 | 2.Bid | 100% | ||||
| 6/1/2007 8:00 | 11/1/2007 17:00 | 3.Construction | 100% | ||||
| 2008001 | Joe Wo | 5/30/2007 8:00 | 8/29/2008 17:00 | Corey Union Landscaping Phase I | Planning | 25% | |
| 5/30/2007 8:00 | 5/30/2007 17:00 | 1.Design | 75% | ||||
| 5/30/2008 8:00 | 5/30/2008 17:00 | 2.Bid | 0% | ||||
| 8/29/2008 8:00 | 8/29/2008 17:00 | 3.Construction | 0% | ||||
| 2007121 | Joe Wo | 5/21/2007 8:00 | 8/31/2007 17:00 | Corey Union Loading Dock Re-surfacing | Complete | 100% | |
| 5/21/2007 8:00 | 5/21/2007 17:00 | 1.Design | 100% | ||||
| 5/21/2007 8:00 | 5/21/2007 17:00 | 2.Bid | 100% | ||||
| 8/31/2007 8:00 | 8/31/2007 17:00 | 3.Construction | 100% | ||||
| 200789 | Joe We | 3/7/2007 8:00 | 6/30/2008 17:00 | Corey Union Lobby/Stairwell Beautification | Constr | Erin Boylan | 35% |
| 3/7/2007 8:00 | 3/7/2008 17:00 | 1.Design | 100% | ||||
| 3/7/2007 8:00 | 3/7/2008 17:00 | 2.Bid | 0% | ||||
| 3/7/2007 8:00 | 6/30/2008 17:00 | 3.Construction | 13% | ||||
| 2008042 | Bruce | 1/16/2008 8:00 | 8/15/2008 17:00 | Corey Union TV & Radio Studios Card Access | Planning | 0% | |
| 1/16/2008 8:00 | 1/16/2008 17:00 | 1.Design | 0% | ||||
| 1/16/2008 8:00 | 1/16/2008 17:00 | 2.Bid | 0% | ||||
| 8/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||
| 200675 | Joe Wo | 9/1/2006 8:00 | 11/1/2007 17:00 | Cornish Van Hoesen A Wing Demolition | Constr | 99% | |
| 9/1/2006 8:00 | 5/31/2007 17:00 | 1.Design | 100% | ||||
| 9/1/2006 8:00 | 6/1/2007 17:00 | 2.Bid | 100% | ||||
| 11/1/2007 8:00 | 11/1/2007 17:00 | 3.Construction | 75% | ||||
| 2008053 | Phil | 1/16/2008 8:00 | 8/15/2008 17:00 | Cornish Van Hoesen Tomik Door Replacement | Planning | 0% | |
| 1/16/2008 8:00 | 1/16/2008 17:00 | 1.Design | 0% | ||||
| 1/16/2008 8:00 | 1/16/2008 17:00 | 2.Bid | 0% | ||||
| 8/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||
| 2007113 | Bruce | 5/1/2007 8:00 | 11/30/2007 17:00 | Dowd Fine Arts Fall Protection Dowd Theatre | Complete | 100% | |
| 5/1/2007 8:00 | 5/1/2007 17:00 | 1.Design | 100% | ||||
| 5/1/2007 8:00 | 5/1/2007 17:00 | 2.Bid | 100% | ||||
| 5/1/2007 8:00 | 11/30/2007 17:00 | 3.Construction | 100% | ||||
| 200784 | Joe We | 3/7/2007 8:00 | 3/14/2008 17:00 | Dowd Fine Arts Graphics Art Silk Screen Sink | Planning | Lori Ellis | 56% |
| 3/7/2007 8:00 | 9/28/2007 17:00 | 1.Design | 100% | ||||
| 3/7/2007 8:00 | 11/30/2007 17:00 | 2.Bid | 100% | ||||
| 3/7/2007 8:00 | 3/14/2008 17:00 | 3.Construction | 0% | ||||
| 2008024 | Bruce | 11/15/2007 8:00 | 1/11/2008 17:00 | Dowd Fine Arts Green Room Carpet Replacement | Complete | 100% | |
| 11/15/2007 8:00 | 11/15/2007 17:00 | 1.Design | 100% | ||||
| 11/15/2007 8:00 | 11/15/2007 17:00 | 2.Bid | 100% | ||||
| 1/11/2008 8:00 | 1/11/2008 17:00 | 3.Construction | 100% | ||||
| 2008045 | Chris | 1/16/2008 8:00 | 8/15/2008 17:00 | Dowd Fine Arts Listening Room Renovation | Planning | 0% | |
| 1/16/2008 8:00 | 1/16/2008 17:00 | 1.Design | 0% | ||||
| 1/16/2008 8:00 | 1/16/2008 17:00 | 2.Bid | 0% | ||||
| 8/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||
| 2008054 | Phil | 1/16/2008 8:00 | 8/15/2008 17:00 | Dowd Fine Arts TV Studio Lighting | Planning | 0% | |
| 1/16/2008 8:00 | 1/16/2008 17:00 | 1.Design | 0% | ||||
| 1/16/2008 8:00 | 1/16/2008 17:00 | 2.Bid | 0% | ||||
| 8/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||
| 200509 | Chris | 6/1/2005 8:00 | 8/29/2008 17:00 | Emergency Generators | Constr | 72% | |
| 6/1/2005 8:00 | 3/30/2007 17:00 | 1.Design | 100% | ||||
| 5/1/2007 8:00 | 5/1/2007 17:00 | 2.Bid | 100% | ||||
| 6/1/2007 8:00 | 8/29/2008 17:00 | 3.Construction | 30% | ||||
| 2007106 | Chris | 6/1/2007 8:00 | 7/31/2009 17:00 | Fitzgerald Hall Rehab | Planning | 10% | |
| 6/1/2007 8:00 | 9/15/2008 17:00 | 1.Design | 17% | ||||
| 9/15/2008 8:00 | 12/15/2008 17:00 | 2.Bid | 0% | ||||
| 12/15/2008 8:00 | 7/31/2009 17:00 | 3.Construction | 0% | ||||
| 200708 | Chris | 4/15/2007 8:00 | 8/15/2008 17:00 | Hendrick Hall Bathroom Renovations | Design | 60% | |
| 4/15/2007 8:00 | 1/15/2008 17:00 | 1.Design | 100% | ||||
| 1/15/2008 8:00 | 4/15/2008 17:00 | 2.Bid | 0% | ||||
| 5/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||
| 200795 | Bruce | 2/1/2007 8:00 | 8/15/2007 17:00 | Higgins Hall Roof Replacement | Complete | 100% | |
| 2/1/2007 8:00 | 4/10/2007 17:00 | 1.Design | 100% | ||||
| 5/1/2007 8:00 | 5/1/2007 17:00 | 2.Bid | 100% | ||||
| 5/1/2007 8:00 | 8/15/2007 17:00 | 3.Construction | 100% | ||||
| 2008026 | Phil | 12/20/2007 8:00 | 1/15/2008 17:00 | McDonald Bldg 2nd Flr Rear Asbestos Abatement | Constr | Twiss | 100% |
| 12/20/2007 8:00 | 12/20/2007 17:00 | 1.Design | 100% | ||||
| 1/15/2008 8:00 | 1/15/2008 17:00 | 2.Bid | 100% | ||||
| 1/15/2008 8:00 | 1/15/2008 17:00 | 3.Construction | 100% | ||||
| 2008022 | Bruce | 1/15/2008 8:00 | 8/15/2008 17:00 | McDonald Bldg Repair Dormers & Slate | Planning | 0% | |
| 1/15/2008 8:00 | 1/15/2008 17:00 | 1.Design | 0% | ||||
| 1/15/2008 8:00 | 1/15/2008 17:00 | 2.Bid | 0% | ||||
| 8/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||
| 2008057 | Bruce | 1/15/2008 8:00 | 8/15/2008 17:00 | Memorial Libraary Commons Writing Center Add System Furniture | Planning | 0% | |
| 1/15/2008 8:00 | 1/15/2008 17:00 | 1.Design | 0% | ||||
| 1/15/2008 8:00 | 1/15/2008 17:00 | 2.Bid | 0% | ||||
| 8/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||
| 200778 | Bruce | 3/7/2007 8:00 | 11/1/2007 17:00 | Memorial Library Card Access for Front Door | Complete | Gail Wood | 99% |
| 3/7/2007 8:00 | 3/7/2007 17:00 | 1.Design | 100% | ||||
| 3/7/2007 8:00 | 3/7/2007 17:00 | 2.Bid | 100% | ||||
| 3/7/2007 8:00 | 11/1/2007 17:00 | 3.Construction | 100% | ||||
| 2008055 | Bruce | 1/15/2008 8:00 | 8/15/2008 17:00 | Memorial Library Install New Blue Light at Bookmark Entrance | Planning | 0% | |
| 1/15/2008 8:00 | 1/15/2008 17:00 | 1.Design | 0% | ||||
| 1/15/2008 8:00 | 1/15/2008 17:00 | 2.Bid | 0% | ||||
| 8/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||
| 2008023 | Bruce | 12/15/2007 8:00 | 2/15/2008 17:00 | Memorial Library Replace Back Entrance Glass Door | Constr | 67% | |
| 12/15/2007 8:00 | 12/17/2007 17:00 | 1.Design | 100% | ||||
| 12/15/2007 8:00 | 12/17/2007 17:00 | 2.Bid | 100% | ||||
| 2/15/2008 8:00 | 2/15/2008 17:00 | 3.Construction | 0% | ||||
| 200759 | Bruce | 2/1/2007 8:00 | 11/1/2007 17:00 | Memorial Library Replace West Main Entrance Doors | Constr | 99% | |
| 2/1/2007 8:00 | 8/15/2007 17:00 | 1.Design | 100% | ||||
| 2/1/2007 8:00 | 8/15/2007 17:00 | 2.Bid | 100% | ||||
| 2/1/2007 8:00 | 11/1/2007 17:00 | 3.Construction | 99% | ||||
| 2008052 | Bruce | 1/16/2008 8:00 | 8/15/2008 17:00 | Miller Bldg 2nd & 3rd Floor Corridor Carpet & Painting | Planning | 0% | |
| 1/16/2008 8:00 | 1/16/2008 17:00 | 1.Design | 0% | ||||
| 1/16/2008 8:00 | 1/16/2008 17:00 | 2.Bid | 0% | ||||
| 8/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||
| 200763 | Bruce | 2/1/2007 8:00 | 11/30/2007 17:00 | Miller Bldg 2nd & 3rd Floor New Corridor Lighting Fixtures | Complete | Bill Shaut | 99% |
| 2/1/2007 8:00 | 8/15/2007 17:00 | 1.Design | 100% | ||||
| 2/1/2007 8:00 | 8/15/2007 17:00 | 2.Bid | 100% | ||||
| 2/1/2007 8:00 | 11/30/2007 17:00 | 3.Construction | 100% | ||||
| 200786 | Joe We | 3/7/2007 8:00 | 4/1/2008 17:00 | Miller Bldg Admissions College Event Signage | Bidding | Mark Yacavone | 73% |
| 3/7/2007 8:00 | 9/28/2007 17:00 | 1.Design | 100% | ||||
| 3/7/2007 8:00 | 10/30/2007 17:00 | 2.Bid | 50% | ||||
| 4/1/2008 8:00 | 4/1/2008 17:00 | 3.Construction | 0% | ||||
| 2008047 | Phil | 1/16/2008 8:00 | 8/15/2008 17:00 | Miller Bldg Admissions Office Redesign | Planning | 0% | |
| 1/16/2008 8:00 | 1/16/2008 17:00 | 1.Design | 0% | ||||
| 1/16/2008 8:00 | 1/16/2008 17:00 | 2.Bid | 0% | ||||
| 8/15/2008 8:00 | 8/15/2008 17:00 | 3.Construction | 0% | ||||